Programme Overview
This program will identify the parameters that must be considered in selecting the Sand Control technique to be used. Each of the various sand control techniques is presented. Examples, problems and case histories will be examined to illustrate key points. Sand control failures will be used to illustrate the types of problems that can lead to early well failures.
The program reviews the difficult issue of deciding when sand control will be needed and explains why gravel packing is usually the best option. Gravel pack design and placement methods are discussed in detail.
Who Should Attend
- Production; Completion Drilling Engineers and Supervisors with at least five years’ experience
Programme Objectives
- Prediction of Sand Problems
- Determine the causes of sand production
- Determine the need for sand control
- Select the best sand control method
Targeted Competencies
Programme Content
Day 1: Sand Failure Predictions
- Understanding sand production
- Basic rock mechanics
- Sand failure prediction
- Sand Control Methods
- Improved Completion efficiency
- Rate Control and Arching
- Selective Perforation
- Plain Screens
- Pre-packed screens
- Gravel Packing
- Consolidation
- Other Methods
Day 2: Gravel Pack Design and Procedures
- Type of gravel pack and their effect on Well performance
- Gravel selection
- Screen and liner considerations
- Packer and liner equipment
- Perforation and cleaning methods
- Gravel placement
- Gravel pack fluids
- Formation damage
- Special considerations.
Day 3: Horizontal Well Completions
- Completion options
- Design considerations
- Drilling fluid selection
- Completion procedures.
- Discussion of Case Histories and Local Situations